DCP 1800kw 2250kVA Data Center Diesel Generator with Shanghai Mitsubishi Sme S16r2-Ptaw-C Engine

Product Details
Customization: Available
After-sales Service: Responsible
Warranty: 12 Months or 1000 Operation Hours
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment methods: visa mastercard discover JCB diners club american express T/T
  Support payment in USD
Secure payments: Every payment you make at Made-in-china.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory, Trading Company
Secured Trading Service
Diamond Member Since 2019

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Cooperated with Fortune 500
This supplier has Cooperated with Fortune 500 companies
Flexible Customization
The supplier provides Flexible customization services for your Personalized requirements
OEM Services
The supplier provides OEM services for popular brands
to see all verified strength labels (21)
  • DCP 1800kw 2250kVA Data Center Diesel Generator with Shanghai Mitsubishi Sme S16r2-Ptaw-C Engine
  • DCP 1800kw 2250kVA Data Center Diesel Generator with Shanghai Mitsubishi Sme S16r2-Ptaw-C Engine
  • DCP 1800kw 2250kVA Data Center Diesel Generator with Shanghai Mitsubishi Sme S16r2-Ptaw-C Engine
  • DCP 1800kw 2250kVA Data Center Diesel Generator with Shanghai Mitsubishi Sme S16r2-Ptaw-C Engine
  • DCP 1800kw 2250kVA Data Center Diesel Generator with Shanghai Mitsubishi Sme S16r2-Ptaw-C Engine
  • DCP 1800kw 2250kVA Data Center Diesel Generator with Shanghai Mitsubishi Sme S16r2-Ptaw-C Engine
Find Similar Products
  • Overview
  • Company Profile
  • Product Description
  • Specification
  • Genset Workshop
  • FAQ
Overview

Basic Info.

Model NO.
MC
Installation Method
Fixed
Stroke
Four Stroke
Cooling Method
Water Cooling
Output Type
AC Three Phase
Speed
Low Speed
Conditions of Use
Land Use
Usage
Common Units, Standby Unit, Emergency Crew
Landuse Type of Unit
Automation Type
Excitation Mode
Static Exciter
Engine Brand
Mitsubishi/Sme
Alternator Brand
Stamford/Leroy Somer/Marathon/Mecca, Optional
Control Panel
Deepsea/Comap/Deif/Smartgen and Others
Cylinders
4-20 Cylinders
Canopy Type
Silent Sound Proof/Weather Proof/Anti-Rusted Proof
Frequency(Hz)
50Hz/60Hz
Voltage Output
220-440V, 110-480V
Application
Hospital/Construction/Building/Data Center
Application[a]
Power Plant/Factory/Mining/Retal
Accessory[a]
Spare Part Document
Governing Type
Mech/Elec/ECU/Ecm/Adec/Hpcr
Service Coverage
Global Service
Certificate Available
CE, ISO, OEM Authorization etc.
2500kVA Standby Generator
2000kw Container Generator
Industrial Diesel Generator Set
Power Generating Sets
Transport Package
Both Standard Marine Packing or Compact Packing.
Specification
As below Spec. with details
Trademark
Mecca
Origin
China
HS Code
850211
Production Capacity
1000/Year

Packaging & Delivery

Package Size
679.00cm * 220.00cm * 252.00cm
Package Gross Weight
16400.000kg

Product Description

Company Profile

Mecca Powerwith self-owned factory assets, independent R&D team, complete infrastructure equipment, provides a professional solution for the design, production and application support of intelligent generator sets with a broad and diverse range of gen-set power products that can operate independently, paralleled, on-site or remotely controlled.

As a prestigious OEM, we maintain a sound relationship with our main material suppliers, such as Cummins, Perkins, Deutz,  Mitsubishi,MTU, Doosan, Stamford, Leroy Somer, Mecc Alte, Deepsea, ComAp, etc. Strongly focused on innovation and technical service, Mecca Power has been successfully used in hundreds of projects, widely applied in buildings, constructions, Telecom, data centers, power plant, etc., covering over 90 countries in Asia, Africa, Oceania, Europe, Middle East and America.

DCP 1800kw 2250kVA Data Center Diesel Generator with Shanghai Mitsubishi Sme S16r2-Ptaw-C Engine

Product Description

500kw-2000kw Mitsubishi/SME diesel generator with Stamford/Leroy Somer  Alternator

DCP 1800kw 2250kVA Data Center Diesel Generator with Shanghai Mitsubishi Sme S16r2-Ptaw-C Engine
DCP 1800kw 2250kVA Data Center Diesel Generator with Shanghai Mitsubishi Sme S16r2-Ptaw-C Engine

 

DCP 1800kw 2250kVA Data Center Diesel Generator with Shanghai Mitsubishi Sme S16r2-Ptaw-C EngineDCP 1800kw 2250kVA Data Center Diesel Generator with Shanghai Mitsubishi Sme S16r2-Ptaw-C EngineDCP 1800kw 2250kVA Data Center Diesel Generator with Shanghai Mitsubishi Sme S16r2-Ptaw-C EngineDCP 1800kw 2250kVA Data Center Diesel Generator with Shanghai Mitsubishi Sme S16r2-Ptaw-C EngineDCP 1800kw 2250kVA Data Center Diesel Generator with Shanghai Mitsubishi Sme S16r2-Ptaw-C EngineDCP 1800kw 2250kVA Data Center Diesel Generator with Shanghai Mitsubishi Sme S16r2-Ptaw-C Engine

Specification
Powered by  SME                                                                                         50HZ    220V-440V     688-2500KVA 
Model LTP PRP Engine Fuel Cons.L/H Cyl. Disp. Gov.
KVA / KW  KVA/KW  Model Origin 100% L
MC688MS 688  550  625 500  S6R2-PTA-C CN 139 6L 30.0  E
MC825MS 825 660  750 600  S6R2-PTAA-C CN 170 6L 30.0  E
MC1375MS 1375 1100  1250 1000  S12R-PTA-C CN 266 12V 49.0  E
MC1540MS 1540 1232  1400 1120  S12R-PTA2-C CN 281 12V 49.0  E
MC1650MS 1650 1320  1500 1200  S12R-PTAA2-C CN 308 12V 49.0  E
MC1915MS 1915 1532  1750 1400  S16R-PTA-C CN 310 16V 65.4  E
MC2100MS 2100 1680  1875 1500  S16R-PTA2-C CN 418 16V 65.4  E
MC2250MS 2250 1800  2050 1640  S16R-PTAA2-C CN 432 16V 65.4  E
MC2500MS 2500 2000  2250 1800  S16R2-PTAW-C CN 476 16V 79.9 E
Powered by  Mitsubishi                                                                                 50HZ    220V-440V     688-2500KVA 
Model LTP PRP Engine Fuel Cons.L/H Cyl. Disp. Gov.
KVA / KW  KVA/KW  Model Origin 100% L
MC825MT 825 660  750 600  S6R2-PTAA JP 170 6L 30.0  E
MC880MT 880 704  800 640  S12A2-PTA JP 174 12V 33.9 E
MC1100MT 1100 880  1000 800  S12H-PTA JP 220 12V 37.1 E
MC1400MT 1400 1120  1250 1000  S12R-PTA JP 266 12V 49.0  E
MC1540MT 1540 1232  1400 1120  S12R-PTA2 JP 281 12V 49.0 E
MC1650MT 1650 1320  1500 1200  S12R-PTAA2 JP 308 12V 49.0 E
MC1915MT 1915 1532  1750 1400  S16R-PTA JP 310 16V 65.4 E
MC2100MT 2100 1680  1875 1500  S16R-PTA2 JP 418 16V 65.4 E
MC2250MT 2250 1800  2050 1640  S16R-PTAA2 JP 432 16V 65.4 E
MC2500MT 2500 2000  2250 1800  S16R2-PTAW JP 476 16V 79.9 E
MC2750MT 2750 2200  2500 2000  S16R2-PTAW-E JP 528 16V 79.9 E
MORE INFO CONTACT US...
Genset Workshop

DCP 1800kw 2250kVA Data Center Diesel Generator with Shanghai Mitsubishi Sme S16r2-Ptaw-C EngineDCP 1800kw 2250kVA Data Center Diesel Generator with Shanghai Mitsubishi Sme S16r2-Ptaw-C EngineDCP 1800kw 2250kVA Data Center Diesel Generator with Shanghai Mitsubishi Sme S16r2-Ptaw-C Engine
DCP 1800kw 2250kVA Data Center Diesel Generator with Shanghai Mitsubishi Sme S16r2-Ptaw-C EngineDCP 1800kw 2250kVA Data Center Diesel Generator with Shanghai Mitsubishi Sme S16r2-Ptaw-C EngineDCP 1800kw 2250kVA Data Center Diesel Generator with Shanghai Mitsubishi Sme S16r2-Ptaw-C Engine

FAQ

1.Q: What is your MOQ of this item?
A:1 Set

2.Q: What are your payment terms?
A:30% TT as deposit,70% TT before Shipment or 100% LC at sight

3.Q:What's the warranty time of diesel generators?
A:Global Warranty: 12months after delivery or 1000 running hours, whichever come first.

4.Q:Can you accept the customized products?
A:Yes, of course.We accept your specific order if you can provide us your special requirements or special samples

5.Q:What's the delivery time ?
A:20 to 35 days after receiving your payment in advance.

6.Q:Do you offer OEM service?
A: Yes

7.Q:What is the power range do you have?
A:Mecca Power assemble genset from 2 to 4000kva

8.Q:What's your special compare to other manufacturer?
A:We can delivery genset 1000units/month as engine and alternator OEM and Strategic partners. Especially for big quantity and big power projects, we support not only by solutions and tender documents, but also by fast delivery time and good price.


-----------------------------------------------------------------------------------------------MAITAINENCE---------------------------------------------------------------------------------------------


General Troubleshooting            

This section lists the generating set for some common fault, the reasons for the failure and determines the            
method of fault. General operators can determine their own fault and note, maintenance it according to the            
brochure. But please contact the repairing agents when meeting a special note or not listed failure of operation.            
Please remember the following suggestions before repairing:            
- Make sure that study the failure carefully before any operation.            
- Repair with the easiest way and most commonly used method.            
- Find the exact causes of failure and completely solve the fault.      
     

1. Generator Sets            
Description of this section is for reference only. If the following failure occurs please contact the repairing agents.            
(Some models of control panel installed only parts of the following warning indicator light)
Icon Indicator Light Reason Fault Analysis
Low oil pressure
alarm
Low oil pressure
alarm
When oil pressure does not
reduce normally, the light is on.
-General because of a lack of oil or lubrication
system failure caused by (refueling or replacing
the oil filter)
-When occurs this fault should automatically
shutdown generator sets immediately.
High water
temperature
alarm
High water
temperature
alarm
When the water temperature
has risen to a level higher than
or equal to the sensor setting,
the light is on.
-General because of a lack of water or oil
shortage, or overload.
-When occurs this fault should automatically
shutdown generator sets immediately.
Low fuel level
alarm
Low fuel level
alarm
When a fuel level has been
detected by the sensor fitted to
the daily tank, the light is on.
-General because of a lack of water or oil
shortage, or overload.
-When occurs this fault should automatically
shutdown generator sets immediately.
Battery charger
fault alarm
Battery charger
fault alarm
If the charging system has fault,
when engine running, the light is
off.
-Battery charging system fault caused.
-The light is on at the initial start, when the
charger reaches a certain speed, the light is off.
-This failure will not lead to automatic shutdown
generating units.
Crank failure
alarm
Crank failure
alarm
When the generator set failed
three times (or six times) in a
row starting, the light is on.
-Oil supply system or re-start the system failure
caused.
Overload or
breaker tripping
alarm
Overload or
breaker tripping
alarm
When overloading or Short
circuit, the light is on. Tripping
circuit breakers cause generator
set load out.
-In this fault, it need to load or unload some parts
to eliminate short-circuit, and then re-close the
circuit breaker.
DCP 1800kw 2250kVA Data Center Diesel Generator with Shanghai Mitsubishi Sme S16r2-Ptaw-C Engine

Introduction of Maintenance grade(Interval) for the generator set
 

A Level Maintenance Interval (Daily Maintenance)
1. Check Daily Report of Genset .
2. Check fuel level and coolant level. 
3. Check alternator for cracks or other damage, and the condition of the belts must be checked, flab or 
other damage.
4. Check the Air filter. The air filter should be replaced when necessary .
5. Release fuel tank and fuel filter's water and sediment.
6. Check the water cooling filter.
7. Check starting battery and electrolyte, add electrolyte when necessary. 
8. Check the starter, check noisy defect.
9. Use air syringe cleaner to clean the water tank, coolant system and cooled fin net.
B Level Maintenance Interval (Less than 400 hours)
1. Repeatedly check A Level Daily Maintenance steps.
2. After operating 100 to 250 hours, replace the fuel filter. All the fuel filters should not be cleaned, it 
should be replaced. 100 to 250 hours is just flexible time, actually it must be according to the practice 
and real fact. 
3. After operating 200 to 250 hours, replace the oil & oil filter. All the lube oil must fit up to the CF 
Grade of American Petroleum Institute.
4. After operating 300 to 400 hours, replace the air filter. The air filter can be cleaned with air syringe, or 
it can be replaced. The replacement must be according to the environment and real fact.
5. Replace the cooling system and add coolant concentration.
6. Clean the crankshaft and inlet, outlet air- filter net. 
C Level Maintenance Interval (2000-3000 hours), Please do as follows:
1. Repeatedly check A and B Level Daily Maintenance steps.
2. Remove the tap of valve, clean and wash oil dirt and sludge.
3. Fasten snails from each part (including running parts and fixed parts)
4. Clean and wash the crankcase, oil sludge, steel scraps and sediment with engine.
5. Check wearing of the engine turbo, clean and wash accumulation of carbon, adjust it when necessary.
6. Check and adjust valve clearance.
7. Check PT pump, quality of injection, adjust injection process, adjust it when necessary.
8. Check and adjust the tension of fan belt and water pump belt, adjust and replace it when necessary; 
clean and wash water tank radiator fins, then check the using capability of thermostat.
Current Repair (D Level Maintenance)(3000-4000 hours)
1. Check valve, valve seat and other wearing, repair or change it when necessary.
2. Check P pump, quality of injection, repair and adjust it when necessary.
3. Check and adjust connecting rod and fastening twisting torque.
4. Check and adjust valve clearance.
5. Check the trip of injector.
6. Check and adjust tension of fan and generating belt.
7. Clean and wash accumulation of carbon in inlet pipes.
8. Clean and wash the core of air cooler.
9. Clean and wash the whole oil lubrication system.
10. Clean and wash room of rocker arm, oil sludge in the sump and Metal scrap-iron.
Medium Repair (6000-8000 hours)
1. Including the items of minor repair.
2. Disassemble generator(except crankshaft)
3. Check the easy worn spare parts in pitman shaft system, gas distribution system, lubrication system, 
cooling system of cylinder, Piston, Intake and exhaust valve, replace them when necessary.
4. Check fuel supplying system, adjust oil pump and injector.
5. Repair and test the alternator, clean oil-sediment and lubricate the bearing of alternator.
Overhaul (9000-15000hours)
1. Including the items of intermediate repair.
2. Disassemble all the parts in the generator.
3. Replace cylinder, piston, piston loop, big and small bearing bushes, trusting pad of crankshaft, intake 
and exhaust valve, a whole set of tools for generator repair 
4. Adjust oil pump, injector and replace pump core, injector
5. Replace a whole set of repair tools for turbo charger and a repair set for water pump.
6. Adjust the parts of connecting rod, crankshaft and generator body,repair or replace them when necessary

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier