300kw/375kVA Automatic Yuchai Diesel Engine Generator 20FT Container for Hotel

Product Details
Customization: Available
After-sales Service: Responsible
Warranty: 12 Months or 1200 Operation Hours
Manufacturer/Factory, Trading Company
Diamond Member Since 2019

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Cooperated with Fortune 500
This supplier has Cooperated with Fortune 500 companies
Flexible Customization
The supplier provides Flexible customization services for your Personalized requirements
OEM Services
The supplier provides OEM services for popular brands
to see all verified strength labels (21)
  • 300kw/375kVA Automatic Yuchai Diesel Engine Generator 20FT Container for Hotel
  • 300kw/375kVA Automatic Yuchai Diesel Engine Generator 20FT Container for Hotel
  • 300kw/375kVA Automatic Yuchai Diesel Engine Generator 20FT Container for Hotel
  • 300kw/375kVA Automatic Yuchai Diesel Engine Generator 20FT Container for Hotel
  • 300kw/375kVA Automatic Yuchai Diesel Engine Generator 20FT Container for Hotel
  • 300kw/375kVA Automatic Yuchai Diesel Engine Generator 20FT Container for Hotel
Find Similar Products

Basic Info.

Model NO.
MC
Installation Method
Fixed
Stroke
Four Stroke
Cooling Method
Water Cooling
Output Type
AC Three Phase
Speed
Low Speed
Conditions of Use
Land Use
Usage
Common Units, Standby Unit, Emergency Crew
Landuse Type of Unit
Automation Type
Excitation Mode
Static Exciter
Engine Brand
Yuchai
Alternator
Permanent Magnet Alternator
Control Panel
Smartgen and Others
Soundless Generator Price
Three Phase Generator Price
Canopy Type
Silent Sound Proof/Waterproof/Anti-Freeze Canopy
Frequency(Hz)
50Hz/60Hz
Voltage Output
230/400V
Application[a]
Telecom Communication/Hospital/ Construction
Application[B]
Mining/Power Plant/Factory/Industrial
Accessory
Spare Parts Documents
Governing Type
Mech/Elec/ECU/Ecm/Adec/Hpcr
Electric Start Generator
Portable Power Generator Set
Certificate Available
CE, ISO, OEM Authorization etc.
Diesel Engine Generator
Soundless Generator
Powerica Generator
1500rpm 1800rpm Diesel Generator
Transport Package
Both Standard Marine Packing or Compact Packing.
Specification
As below Spec. with details
Trademark
Mecca
Origin
China
HS Code
85021100
Production Capacity
1000/Year

Product Description

MECCA POWER  DIESEL GENERATOR

All key part produced by Chinese manufacturers,designed by Mecca,
Fuel consumption down to 4.28L/h,with superior sound proof tech,61-63 dB in 7m.

We're Mecca Power,but do more than power,always trying best to supply performance monster to you.


300kw/375kVA Automatic Yuchai Diesel Engine Generator 20FT Container for Hotel
300kw/375kVA Automatic Yuchai Diesel Engine Generator 20FT Container for Hotel
300kw/375kVA Automatic Yuchai Diesel Engine Generator 20FT Container for Hotel
 
300kw/375kVA Automatic Yuchai Diesel Engine Generator 20FT Container for Hotel
300kw/375kVA Automatic Yuchai Diesel Engine Generator 20FT Container for Hotel
300kw/375kVA Automatic Yuchai Diesel Engine Generator 20FT Container for Hotel300kw/375kVA Automatic Yuchai Diesel Engine Generator 20FT Container for Hotel300kw/375kVA Automatic Yuchai Diesel Engine Generator 20FT Container for Hotel
Genset Main Technical Data
Genset Model MC2DC
Prime Power 16kW
Standby Power 17.6KW
Frequency/Speed 50Hz/1500rpm
Standard Voltage 230/400V, Others as Application Requested
Phases Three phases, four wires
Dimensions(L×W×H)mm Open/Silent dimension as below list
100% Fuel Cons. (L/H) 3.9~77.6
Base Fuel tank (hour) 8~10
Alternator Specifications
Alternator Model MECCA
Output power 16kW-660kW
Voltage control AVR
Number of phase 3
Power factor (Cos Phi) 0.8
Insulation Class H
Number of Wires  6
Protection 23
Altitude  ≤ 1000 m
Number of Pole  4
Exciter type AREP
Voltage regulation ±0.5%           
Totale Harmonic distortion at no load < 4 % - on load < 4 %
Bearing   Single
Coupling Direct
Alternator Data
♦ Operate either 50Hz or 60Hz. ♦Stator grease insulation covered
♦ Standard enclosure IP23, but IP44, IP55 for option ♦Rotator and excitation high polymer
♦ Insulation class H.  ♦ Resist the corruption oil and acid
♦ Shunt excitataion systems. ♦Rotator balance is in accordance with BS5625  
♦ AREP or PMG system for options.  standard 12.5
♦ Automatic voltage regulator ♦High-quality lubrication sealed long-time bearing
♦ Single bearing alternator ♦Rotator silicon steel close tight
Standard Accessories
*Auto Control Panel *Starting Motor
*Main Ciruit Breaker *Exhaust silencer
*Fuel tank *Starting battery
*Base Frame *Float battery charger
*Filter  *Flange
300kw/375kVA Automatic Yuchai Diesel Engine Generator 20FT Container for Hotel
300kw/375kVA Automatic Yuchai Diesel Engine Generator 20FT Container for Hotel
300kw/375kVA Automatic Yuchai Diesel Engine Generator 20FT Container for Hotel300kw/375kVA Automatic Yuchai Diesel Engine Generator 20FT Container for Hotel

 

 Mecca Power, as part of a Global Power Supplier initiative, provides a professional solution for the design, application and after-sales support of generators, with self-owned factory assets, independent R&D team, complete infrastructure equipment, provides a professional solution for the design, production and application support of intelligent generator sets with a broad and diverse range of gen-set power products that can operate independently, paralleled, on-site or remotely controlled.
 
As a prestigious OEM, we maintain a sound relationship with our main material suppliers, such as Deutz, Man, Doosan, Stamford, Leroy Somer, Mecc Alte, Deepsea, ComAp, etc. 
 
Strongly focused on innovation and technical service, Mecca Power has been successfully used in hundreds of projects, widely applied in buildings, constructions, Telecom, data centers, mining,  etc., covering over 90 countries in Asia, Africa, Oceania, Europe, Middle East and America. 
 
With over 10 years of experience in manufacturing and exporting energy products, the Mecca team will provide you full-service solutions.
 BELIVE THAT WE ARE WORTHY OF YOUR TRUST!

-----------------------------------------------------------------------------------------------MAINTENANCE---------------------------------------------------------------------------------------------

General Troubleshooting            

This section lists the generating set for some common fault, the reasons for the failure and determines the            
method of fault. General operators can determine their own fault and note, maintenance it according to the            
brochure. But please contact the repairing agents when meeting a special note or not listed failure of operation.            
Please remember the following suggestions before repairing:            
- Make sure that study the failure carefully before any operation.            
- Repair with the easiest way and most commonly used method.            
- Find the exact causes of failure and completely solve the fault.      
     

1. Generator Sets            
Description of this section is for reference only. If the following failure occurs please contact the repairing agents.            
(Some models of control panel installed only parts of the following warning indicator light)
Icon Indicator Light Reason Fault Analysis
Low oil pressure
alarm
Low oil pressure
alarm
When oil pressure does not
reduce normally, the light is on.
-General because of a lack of oil or lubrication
system failure caused by (refueling or replacing
the oil filter)
-When occurs this fault should automatically
shutdown generator sets immediately.
High water
temperature
alarm
High water
temperature
alarm
When the water temperature
has risen to a level higher than
or equal to the sensor setting,
the light is on.
-General because of a lack of water or oil
shortage, or overload.
-When occurs this fault should automatically
shutdown generator sets immediately.
Low fuel level
alarm
Low fuel level
alarm
When a fuel level has been
detected by the sensor fitted to
the daily tank, the light is on.
-General because of a lack of water or oil
shortage, or overload.
-When occurs this fault should automatically
shutdown generator sets immediately.
Battery charger
fault alarm
Battery charger
fault alarm
If the charging system has fault,
when engine running, the light is
off.
-Battery charging system fault caused.
-The light is on at the initial start, when the
charger reaches a certain speed, the light is off.
-This failure will not lead to automatic shutdown
generating units.
Crank failure
alarm
Crank failure
alarm
When the generator set failed
three times (or six times) in a
row starting, the light is on.
-Oil supply system or re-start the system failure
caused.
Overload or
breaker tripping
alarm
Overload or
breaker tripping
alarm
When overloading or Short
circuit, the light is on. Tripping
circuit breakers cause generator
set load out.
-In this fault, it need to load or unload some parts
to eliminate short-circuit, and then re-close the
circuit breaker.

Introduction of Maintenance grade(Interval) for the generator set 
A Level Maintenance Interval (Daily Maintenance)
1. Check Daily Report of Genset .
2. Check fuel level and coolant level. 
3. Check alternator for cracks or other damage, and the condition of the belts must be checked, flab or 
other damage.
4. Check the Air filter. The air filter should be replaced when necessary .
5. Release fuel tank and fuel filter's water and sediment.
6. Check the water cooling filter.
7. Check starting battery and electrolyte, add electrolyte when necessary. 
8. Check the starter, check noisy defect.
9. Use air syringe cleaner to clean the water tank, coolant system and cooled fin net.
B Level Maintenance Interval (Less than 400 hours)
1. Repeatedly check A Level Daily Maintenance steps.
2. After operating 100 to 250 hours, replace the fuel filter. All the fuel filters should not be cleaned, it 
should be replaced. 100 to 250 hours is just flexible time, actually it must be according to the practice 
and real fact. 
3. After operating 200 to 250 hours, replace the oil & oil filter. All the lube oil must fit up to the CF 
Grade of American Petroleum Institute.
4. After operating 300 to 400 hours, replace the air filter. The air filter can be cleaned with air syringe, or 
it can be replaced. The replacement must be according to the environment and real fact.
5. Replace the cooling system and add coolant concentration.
6. Clean the crankshaft and inlet, outlet air- filter net. 
C Level Maintenance Interval (2000-3000 hours), Please do as follows:
1. Repeatedly check A and B Level Daily Maintenance steps.
2. Remove the tap of valve, clean and wash oil dirt and sludge.
3. Fasten snails from each part (including running parts and fixed parts)
4. Clean and wash the crankcase, oil sludge, steel scraps and sediment with engine.
5. Check wearing of the engine turbo, clean and wash accumulation of carbon, adjust it when necessary.
6. Check and adjust valve clearance.
7. Check PT pump, quality of injection, adjust injection process, adjust it when necessary.
8. Check and adjust the tension of fan belt and water pump belt, adjust and replace it when necessary; 
clean and wash water tank radiator fins, then check the using capability of thermostat.
Current Repair (D Level Maintenance)(3000-4000 hours)
1. Check valve, valve seat and other wearing, repair or change it when necessary.
2. Check P pump, quality of injection, repair and adjust it when necessary.
3. Check and adjust connecting rod and fastening twisting torque.
4. Check and adjust valve clearance.
5. Check the trip of injector.
6. Check and adjust tension of fan and generating belt.
7. Clean and wash accumulation of carbon in inlet pipes.
8. Clean and wash the core of air cooler.
9. Clean and wash the whole oil lubrication system.
10. Clean and wash room of rocker arm, oil sludge in the sump and Metal scrap-iron.
Medium Repair (6000-8000 hours)
1. Including the items of minor repair.
2. Disassemble generator(except crankshaft)
3. Check the easy worn spare parts in pitman shaft system, gas distribution system, lubrication system, 
cooling system of cylinder, Piston, Intake and exhaust valve, replace them when necessary.
4. Check fuel supplying system, adjust oil pump and injector.
5. Repair and test the alternator, clean oil-sediment and lubricate the bearing of alternator.
Overhaul (9000-15000hours)
1. Including the items of intermediate repair.
2. Disassemble all the parts in the generator.
3. Replace cylinder, piston, piston loop, big and small bearing bushes, trusting pad of crankshaft, intake 
and exhaust valve, a whole set of tools for generator repair 
4. Adjust oil pump, injector and replace pump core, injector
5. Replace a whole set of repair tools for turbo charger and a repair set for water pump.
6. Adjust the parts of connecting rod, crankshaft and generator body,repair or replace them when necessary

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier